By: Pacific Corrugated Pipe Co.
The Bureau of Land Management was in need of a new, eco-friendly culvert solution that would allow for a proper fish passage west of Wolf Creek in Oregon. In addition to providing safe passage for fish, this new design called for construction loading and heavy vehicle traffic support on 2 one-way logging roads.
After reviewing the specs of the project Pacific Corrugated Pipe decided to use 180’ of structural plate as two separate flow through solutions. CSP was also used to allow temporary flow-through for the creek until the completion of the permanent structural plate.
In then end, the structural plate solution provided a safe and reliable passage for the fish and was able to hold 8 million pounds!
For more information visit Pacific Corrugated Pipe Co. at their website.