14070 Proton Road Suite 100 LB 9 Dallas, TX 75244

Aluminum Coated Type 2

NCSPA » CSP Coatings » Aluminum Coated Type 2
OverviewALT2 ApplicationsDOT InformationSuccess StoriesResources

Aluminum Coated Type 2

 

corrugated steel pipe detention system large volume detention systemAluminum Coated Type 2 (AASHTO M274, ASTM A929) is a pure aluminum coating (no more than 0.35 percent silicon). It is produced with a coating weight of 305 g/m² (1 oz/ft²) of surface (total both sides) to provide a coating thickness of 48 µm (0.0019 in.) on each surface. The aluminum coated type 2 (ALT2) is the most widely used supplemental coating for CSP. “Aluminum is a reactive metal, but it develops a passive aluminum oxide coating or film that protects it from corrosion in many environments.” This film is quite stable in neutral and many acid solutions but is attacked by alkalies greater than a pH of 9. From a corrosion standpoint, aluminum has an advantage over galvanized in lower pH and in soft water conditions due to the formation of the oxide film. The coatings are essentially equal under abrasion and in waters where the zinc oxide film forms rapidly.

Aluminum coated type 2 CSP has been installed at thousands of sites over the past 50 years and many of these sites have been and are still being monitored for performance. Recent AK Steel research has indicated that 14 gage ALT2 CSP can achieve a 100-year service life when the environmental conditions have a pH of 5 to 9 and a resistivity greater than 1500 ohm-cm.

For more information download our Pipe Selection Guide found here.

DOT Information

The below is a map of the states that currently accept ALT2 coated pipe and plate in their specs.

Success Stories

Project Spotlight: Clay County South Dakota Skewed Culvert & Headwall

By: TrueNorth Steel Mother Nature was relentless on South Dakota in 2019, bringing rain at unprecedented levels throughout the year. That rain led to the ... Read more

Project Spotlight: MAWC Sewer Site Campus Expansion

By: Lane Enterprises, Inc The MAWC Sewer Site Campus Expansion is the first phase of a $6 million project to build a new garage and ... Read more
csp access tunnel steel access tunnel

Project Spotlight: Tele Greenland – TREF B1503, Access tunnel

By: ViaCon A/S, Denmark Located in Nanortalik in Greenland, there sits a tunnel that is established at the very top of a mountain.  The purpose ... Read more

Studies, Resources & Marketing Materials

Portland Web Design - Watermelon Web Works LLC