14070 Proton Road Suite 100 LB 9 Dallas, TX 75244

Aluminum Coated Type 2

NCSPA » CSP Coatings » Aluminum Coated Type 2
OverviewALT2 ApplicationsDOT InformationSuccess StoriesResources

Aluminum Coated Type 2

 

corrugated steel pipe detention system large volume detention systemAluminum Coated Type 2 (AASHTO M274, ASTM A929) is a pure aluminum coating (no more than 0.35 percent silicon). It is produced with a coating weight of 305 g/m² (1 oz/ft²) of surface (total both sides) to provide a coating thickness of 48 µm (0.0019 in.) on each surface. The aluminum coated type 2 (ALT2) is the most widely used supplemental coating for CSP. “Aluminum is a reactive metal, but it develops a passive aluminum oxide coating or film that protects it from corrosion in many environments.” This film is quite stable in neutral and many acid solutions but is attacked by alkalies greater than a pH of 9. From a corrosion standpoint, aluminum has an advantage over galvanized in lower pH and in soft water conditions due to the formation of the oxide film. The coatings are essentially equal under abrasion and in waters where the zinc oxide film forms rapidly.

Aluminum coated type 2 CSP has been installed at thousands of sites over the past 50 years and many of these sites have been and are still being monitored for performance. Recent AK Steel research has indicated that 14 gage ALT2 CSP can achieve a 100-year service life when the environmental conditions have a pH of 5 to 9 and a resistivity greater than 1500 ohm-cm.

For more information download our Pipe Selection Guide found here.

DOT Information

The below is a map of the states that currently accept ALT2 coated pipe and plate in their specs.

Success Stories

rainwater storage retention systems

Retention/Detention Project of the Year 2018 Winner: French Valley Self Storage

By: Pacific Corrugated Pipe Co. Pacific Corrugated Pipe was given the opportunity to value engineer and aid in designing one of the largest rainwater storage ... Read more
deteriorated culvert culvert reline spiral rib pipe

Rehab Project Of The Year 2018 Winner – Layden’s Ridge Drive Reline

By: Contech Engineered Solutions Located on Interstate 20 twenty miles east of Dallas, Talty is ideally suited to those seeking large residential lots within easy ... Read more
I-95 Temporary Bridge DOT project of the year

DOT Project Of The Year 2018 Winner: I-95 Temporary Bridge Over North Ave

By: Big R Bridge This project involved the replacement of twin 3-lane bridges for I-95 over North Avenue in Attleboro, MA.  The project specifications called ... Read more

Studies, Resources & Marketing Materials

Portland Web Design - Watermelon Web Works LLC