14070 Proton Road Suite 100 LB 9 Dallas, TX 75244

Aluminum Coated Type 2

NCSPA » CSP Coatings » Aluminum Coated Type 2
OverviewALT2 ApplicationsDOT InformationSuccess StoriesResources

Aluminum Coated Type 2

 

corrugated steel pipe detention system large volume detention systemAluminum Coated Type 2 (AASHTO M274, ASTM A929) is a pure aluminum coating (no more than 0.35 percent silicon). It is produced with a coating weight of 305 g/m² (1 oz/ft²) of surface (total both sides) to provide a coating thickness of 48 µm (0.0019 in.) on each surface. The aluminum coated type 2 (ALT2) is the most widely used supplemental coating for CSP. “Aluminum is a reactive metal, but it develops a passive aluminum oxide coating or film that protects it from corrosion in many environments.” This film is quite stable in neutral and many acid solutions but is attacked by alkalies greater than a pH of 9. From a corrosion standpoint, aluminum has an advantage over galvanized in lower pH and in soft water conditions due to the formation of the oxide film. The coatings are essentially equal under abrasion and in waters where the zinc oxide film forms rapidly.

Aluminum coated type 2 CSP has been installed at thousands of sites over the past 50 years and many of these sites have been and are still being monitored for performance. Recent AK Steel research has indicated that 14 gage ALT2 CSP can achieve a 100-year service life when the environmental conditions have a pH of 5 to 9 and a resistivity greater than 1500 ohm-cm.

For more information download our Pipe Selection Guide found here.

DOT Information

The below is a map of the states that currently accept ALT2 coated pipe and plate in their specs.

Success Stories

storm sewer system

BNSF Intermodal Facility – 2015 Hall of Fame Project of the Year

By: Contech Engineered Solutions In 1994, BNSF Railway built an impressive intermodal facility inRoanoke, Texas. The original construction involved approximately 13 rail lines in a ... Read more
sandy springs gateway corrugated metal pipe sand filters

Sandy Springs Gateway – 2015 Retention/Detention Project of the Year

By: Southeast Culvert The Sandy Springs, Georgia Gateway project was originally designed with a large 144″ underground detention & multiple proprietary WQ units pre-treating the ... Read more
spiral rib ALT2 storm drainage system

Paseo Del Norte – 2015 DOT Project of the Year

By: Contech Engineered Solutions In August 2013, the New Mexico Department of Transportation (NMDOT – District 3), the City of Albuquerque, the Federal Highway Administration ... Read more

Studies, Resources & Marketing Materials

Portland Web Design - Watermelon Web Works LLC