14070 Proton Road Suite 100 LB 9 Dallas, TX 75244

Aluminum Coated Type 2

NCSPA » CSP Coatings » Aluminum Coated Type 2
OverviewALT2 ApplicationsDOT InformationSuccess StoriesResources

Aluminum Coated Type 2

 

corrugated steel pipe detention system large volume detention systemAluminum Coated Type 2 (AASHTO M274, ASTM A929) is a pure aluminum coating (no more than 0.35 percent silicon). It is produced with a coating weight of 305 g/m² (1 oz/ft²) of surface (total both sides) to provide a coating thickness of 48 µm (0.0019 in.) on each surface. The aluminum coated type 2 (ALT2) is the most widely used supplemental coating for CSP. “Aluminum is a reactive metal, but it develops a passive aluminum oxide coating or film that protects it from corrosion in many environments.” This film is quite stable in neutral and many acid solutions but is attacked by alkalies greater than a pH of 9. From a corrosion standpoint, aluminum has an advantage over galvanized in lower pH and in soft water conditions due to the formation of the oxide film. The coatings are essentially equal under abrasion and in waters where the zinc oxide film forms rapidly.

Aluminum coated type 2 CSP has been installed at thousands of sites over the past 50 years and many of these sites have been and are still being monitored for performance. Recent AK Steel research has indicated that 14 gage ALT2 CSP can achieve a 100-year service life when the environmental conditions have a pH of 5 to 9 and a resistivity greater than 1500 ohm-cm.

For more information download our Pipe Selection Guide found here.

DOT Information

The below is a map of the states that currently accept ALT2 coated pipe and plate in their specs.

Success Stories

three-barrel culvert helically corrugated metal pipe

Project Spotlight: Labette County Bridge 183 Replacement

By: Contech Engineered Solutions In Labette County, Kansas, a concrete bridge structure was in need of replacement. Originally built in the early 1900s, the structural ... Read more
deep corrugated structural plate Buried Bridge

Project Spotlight: VT Route 2B Bridge Replacement

By: Big R Bridge The nominated project was a replacement for a 139’ long 3-span bridge constructed in 1936. The project was designed by Big ... Read more
natural stream habitat bottomless deep corrugated structural plate Buried Bridge

Project Spotlight: Beaver Creek Culvert

By: Big R Bridge The Stark St crossing over Beaver Creek consisted of an undersized concrete box culvert with a broken fish ladder that was ... Read more

Studies, Resources & Marketing Materials

Portland Web Design - Watermelon Web Works LLC