14070 Proton Road Suite 100 LB 9 Dallas, TX 75244

Aluminum Coated Type 2

NCSPA » CSP Coatings » Aluminum Coated Type 2
OverviewALT2 ApplicationsDOT InformationSuccess StoriesResources

Aluminum Coated Type 2

 

corrugated steel pipe detention system large volume detention systemAluminum Coated Type 2 (AASHTO M274, ASTM A929) is a pure aluminum coating (no more than 0.35 percent silicon). It is produced with a coating weight of 305 g/m² (1 oz/ft²) of surface (total both sides) to provide a coating thickness of 48 µm (0.0019 in.) on each surface. The aluminum coated type 2 (ALT2) is the most widely used supplemental coating for CSP. “Aluminum is a reactive metal, but it develops a passive aluminum oxide coating or film that protects it from corrosion in many environments.” This film is quite stable in neutral and many acid solutions but is attacked by alkalies greater than a pH of 9. From a corrosion standpoint, aluminum has an advantage over galvanized in lower pH and in soft water conditions due to the formation of the oxide film. The coatings are essentially equal under abrasion and in waters where the zinc oxide film forms rapidly.

Aluminum coated type 2 CSP has been installed at thousands of sites over the past 50 years and many of these sites have been and are still being monitored for performance. Recent AK Steel research has indicated that 14 gage ALT2 CSP can achieve a 100-year service life when the environmental conditions have a pH of 5 to 9 and a resistivity greater than 1500 ohm-cm.

For more information download our Pipe Selection Guide found here.

DOT Information

The below is a map of the states that currently accept ALT2 coated pipe and plate in their specs.

Success Stories

stormwater retention facility stormwater treatment downstream flood control

Project Spotlight: City Center Regional Stormwater Facility

By: Contech Engineered Solutions The city of Mountlake Terrace, Washington needed a new stormwater retention facility to provide stormwater treatment and downstream flood control. The facility would ... Read more
Spillway pump station arched storm drain storm drain

Project Spotlight: Michigan Spillway Flood Control

By: TrueNorth Steel Since 1993, wet conditions have brought water from the upper reaches of this watershed down to the Michigan Spillway Project area.   The ... Read more
Residential detention system detention system retention tank perforated system

Project Spotlight: Fontana Tract Homes

By: Pacific Corrugated Pipe Pacific Corrugated Pipe Co. was approached for a special project for 2 residential tract projects.  Tract 17634 was a 20 Home Cul-de-sac ... Read more

Studies, Resources & Marketing Materials

Portland Web Design - Watermelon Web Works LLC